PROJECT
FoodWorks Estella
Designed by The Retail Group (TRG) in conjunction with the Reddrop Group, the build saw more than 18 months of planning, and incorporated many MB Group custom elements.
​
Project Type – Food Retail
Engineering Consultant – MB Group
REF Contractor (EPCC-M) – MB Group
MECH Contractor (EPCC-M) – MB Group
Co2 Pack Type – Co2 Booster | REF+HVAC | Integrated
Co2 Pack Manufacturer – MB Group
Co2 Gas Cooler Manufacturer – MB Group
Controls Manufacturer - Danfoss
Compressor manufacture – Frascold
Controls Manufacturer – Hussmann
MB GROUP
Custom elements including:
-
A Custom designed and Australian manufactured natural refrigeration system to service the entire store
​
-
Supply and installation of 26 doors of freezer space along with the inclusion of coffin freezers
​
-
Supply and installation of full visibility deli display
​
-
Sushi kiosk grab and go refrigeration cased along with custom under bench refrigeration for storage of supplies
​
-
Supply and installation of walk-in coolroom and refrigeration doors in the liquor department
​
-
240m2 of coolrooms in the back of house area
​
-
Heating and cooling throughout the store.